Published on: March 28, 2026

PRISM-SG PORTAL

PRISM-SG PORTAL

NEWS: Union Ministers have launched the PRISM-SG portal to digitize the approval and inspection processes for Steel Girders in Road Over Bridges (ROBs).

About

  • PRISM-SG Portal (Portal for Rail-Road Inspection & Stages Management – Steel Girders)à Dedicated digital platform designed to streamline the complex technical approvals required for the construction of bridges where highways and railways intersect.
  • Launched inà the portal was officially launched on March 25, 2026, in New Delhi.
  • AimàThe primary objective is to enhance inter-agency coordination and eliminate bottlenecks in the construction of Road Over Bridges (ROBs).
  • The government aims toà ensure the structural integrity of bridges while drastically reducing the time lost in manual paperwork and physical inspections.

Key Features

  • Digital Submission & Scrutinyà Enables contractors and fabricators to submit QAPs and welding specifications online, allowing railway officials to review and raise queries digitally.
  • Real-Time Monitoringà Offers a dashboard for stakeholders to track the exact status of approvals and fabrication stages in real-time.
  • Automated Schedulingà Facilitates the online scheduling of physical inspections and the immediate uploading of inspection reports, photographs, and test results.
  • Audit Trailà Maintains a complete, unalterable digital record of every approval and inspection, ensuring high levels of accountability and transparency.
  • Integration with RRCASà Complements the existing RRCAS portal (used for GAD and Structural Drawings) to provide a 360-degree digital approval ecosystem for bridge projects.

Significance:

  • Reducing the approval cycle by 70% (from 1 year to ~100 days)à highway projects are not stalled at railway crossings.
  • Faster approvals lead to fewer project overruns, saving the exchequer and private contractors significant capital.
  • Removing the offline modeàeliminates the possibility of corruption or administrative lethargy in the inspection process.